Skip to Main Content
NAVOPLAN
NAVOPLAN
Port Intelligence Brief

St Augustine, United States

United States flag
52 Verified Intelligence Items
52Verified
Intelligence
14Official
Sources
92%Overall
Confidence
๐Ÿ“
CoordinatesN 29 53' 60.0000"
W 81 19' .0012"
โš“
Harbor ProfileNorth Atlantic Ocean
Size: Very Small
๐Ÿ›‚
EntranceTidal Range: 4.92 ft
Depth: 11.15 ft
๐Ÿ•’
Port StatusPort of Entry: Yes
Shelter: Excellent
๐Ÿ”„
Last UpdateJun 28, 2026
09:30 ET
๐Ÿงญ Approach & Entrance 7 items
๐Ÿ›Ÿ Shelter & Refuge 7 items
โš  Local Cautions 7 items
๐Ÿ›’ Crew Rest & Resupply 7 items
โ˜Ž Harbor / Authority 5 items ๐Ÿ”’
๐Ÿ“ก Contacts & VHF 5 items ๐Ÿ”’
๐Ÿ›ฅ Marinas 8 items ๐Ÿ”’
โ›ฝ Fuel & Utilities 6 items ๐Ÿ”’
Current Briefing

Approach & Entrance

St Augustine approach intelligence includes pilotage, entrance channel depths, harbor communications, traffic density, anchoring restrictions, and operational cautions for arrival planning.

Verified Intelligence
๐Ÿงญ

Entrance Channel Variability / Outer Shoals

Official Source ยท Verified Jul 05, 2026

Entrance channel subject to frequent change; dangerous, shifting shoals extend about 1 mile seaward.
95% Confidence
๐Ÿงญ

Aids And Marking Practice

Official Source ยท Verified Jul 05, 2026

A lighted whistle buoy marks the approach; buoys marking the channel are frequently moved to mark best water and are not charted.
94% Confidence
๐Ÿงญ

Hazards Adjacent To Jetties

Official Source ยท Verified Jul 05, 2026

Shoaling reported about 100 yd south of north jetty extending south; submerged rocks reported 15 ft east of south jetty; concrete ledge just below surface east of jetties.
93% Confidence
๐Ÿงญ

Local Pilotage Recommendation & Access

Official Source ยท Verified Jul 05, 2026

Local pilotage advised; pilots available by prior arrangement with city dockmaster; at least 24 hours' notice requested.
92% Confidence
๐Ÿงญ

Tidal/Current Cautions

Official Source ยท Verified Jul 05, 2026

Tidal currents through the inlet reported up to 8 knots; recorded values ~2.9 kts flood and 2.5 kts ebb (use predictions for timing).
90% Confidence
๐Ÿงญ

Authorized Channel Project Dimensions

Official Source ยท Verified Jul 05, 2026

Authorized federal project: channel 16 ft by 200 ft across new inlet bar, then 12 ft to the Intracoastal Waterway; includes north sand-trap groin and south sand-tight jetty.
90% Confidence
๐Ÿงญ

Anchorage / Refuge Limitation

Official Source ยท Verified Jul 05, 2026

Anchorage in Matanzas River exists above and below bridge, but inlet bar may be impassable in strong NE or NW winds; not reliable as harbor refuge in such conditions.
90% Confidence